Regression Testing vs Re testing
Agenda of the session:
1. Testing Methods:
Regression Testing
vs
Re testing
Retesting:
Testing again and again to make sure the defect has been
fixed or not
Regression Testing:
Selective retesting of the Software System that has been
modified to make sure modifications are working fine
and modifications have not been impacted by
previously working functionality.
Why systems/Applications undergo modifications?/Changes?
1.Adding New feature/New Technology
2. Updating/deleting exiting featrures
3. To improve the performance of the system
4. To fix the defects in productions system/reported by user
Retesting:
Scenario 1:
1. BA has given the requirement
2. Developer created the Build
3. Env mgmt deployed the build in
Testing server
4. Tester executed the application-->Round 1
5. Tester identified a defect
6. Testing team will inform the defect
to developer
7. Dev has done code changes to fix the
defect
8. Dev created new build
9. env mgmt team deployed new build in
testing server
10. Now we will do retesting to make sure
the defect has been fixed-->Retest
Scenario 2:
1. BA has given the requirement
2. Developer created the Build
3. Env mgmt deployed the build in
Testing server
4. Tester executed the application
5. Tester identified a defect
6. Testing team will inform the defect
to developer
7. Developer rejected the defect stating
it is a "Invalid defect"
8. Tester will do retesting to make sure
the defect is really invalid or not
Scenario 3:
1. BA has given the requirement
2. Developer created the Build
3. Env mgmt deployed the build in
Testing server
4. Tester executed the application
5. Tester identified a defect
6. Testing team will inform the defect
to developer
7. Dev has done code changes to fix the
defect
8. Dev created new build
9. env mgmt team deployed new build in
testing server
10. Now we will do retesting to make sure
the defect has been fixed
11. Retesting failed so again we have
reopened the defect to developer
12. Developer again made some changes
13. Dev created new build
14. env mgmt team deployed new build in
testing server
15. Again we will do retesting to make
sure the defect has been fixed
-------------------------------------------
Scenario 4: ReTesting
1. BA has given the requirement
2. Developer created the Build-->B1.0
3. Env mgmt deployed the build in
Testing server
4. Tester executed the application
5. Tester identified a defect-->B1.0
6. Testing team will inform the defect
to developer
7. Developer rejected the defect stating
it is a "Invalid defect"
8. Tester will do retesting to make sure
the defect is really invalid or not
9. Testing team observed that it is "valid"
10. Again we will reopen the defect to
developer
11. Developer will don code changes
12. Env team will deploy latest Build
13. Now testing has to perform retesting
to make sure defect has been fixed or not
--------------------------------------------
Scenario 5: Regression Testing
When we go for regression Testing?
1. If any modifications made by development
team to fix the defects
1.1 req change
1.2 Des change
1.3 Code change
Retesting to failed test case to make sure
it is working after developer changes-->Retesting
Retesting previously working test case to
make sure modifications has not been impacted
previously working functionality
-->Regression Testing
Regression testing is a kind of retesting
-----------------------------------------
Expected:
Screen 1: Back up of sewerdrain
Screen 10: Back up of sewerdrains
Actaul:
Screen 1: Back up of sewerdrains-->Fail
Screen 10: Back up of sewerdrains-->Pass
Latest Build retest:
Screen 1: Back up of sewerdrain-->Pass
Screen 10: Back up of sewerdrain-->Fail
----------------------------------------
Scenario 6:Regression Testing
Step 1: BA team has given the requirements
Step 2: Dev Built system
Step 3: Env team deployed system
Step 4: Testing team completed testing
Step 5: Now due to client urgency BA team
has added 10 more requirements
Step 6: Dev has to modify the existing code
Step 7: Dev will create latest build
Step 8: Latest build will be deployed
in testing server
Step 9: Now testing team focus will be on
9.1 Newly added features
9.2 Regression testing on
previously working
features
Project:
Release 1:
Newly added Features(100) +
Retesting of defects +
Regression testing
Release 2:
Addition of new featueres
UI+ Application Logic+ DB+ Performance+
+
Production defects
(A feature is not working in live
environment)
Defect Lekage
-------------------------------------------
Gmail:
Release 1: 2004 Jan-->100 R-->1000
Release 2: 2004 April-->120 R-->5000
Release 3: 2004 Dec-->160 R-->10000
40 R+ 160
Code Freeze
Regression Testing: Selective Retesting of
S/w system that has been modifed to make
sure these modifications have not been
impacted previously working functionality
Release 1: 100 R-->2 Months
Release 2: 120 R--> 20 R-->2 weeks+ 1 Week
Limited time but 100% Regression
1. Testing size
2. Selective VS Full
3. Automation
100-->70%
How to do selective Regression?
1. Risk Analysis
2. Priorotization
--------------------------------------------
IQ:
-----------------------------------------------------
Definition:
Selective retesting of software system that has been
modified to make sure defect has been fixed and it is not
impacting any sideaffects on previously working
functionality
--------------------------------------------------
Full Regression vs Selective regression
1. Automation
2. Risk Analysis and priorities
3. We wil divide our test cases into High Risk,
Medium Risk and Low Risk test cases
----------------------------------------------------------------------
Interview Questions on Regression Testing and Retesting?
1. What is Retesting?
2. Why we need Retesting?
3. When we do Retesting?
4. How to do Retesting?
5. What is Regression Testing?
6. Why we need Regression Testing?
7. When we do Regression Testing?
8. How to do Regression Testing?
9. What are the challlenges you have faced whie doing Regression?
10. Regression Testing is strong candidate for Automation Testing?
Justify this statement?
Ans: Repetetive-Every Release
11. How to select Regression suite if we are not having time to
do full regression Testing?
Ans: High Risk + High Priority
12. Do we need to change Regression Approach every release?
Ans: Yes
13. Explain differences between Retesting and Regression Testing?
Retesting focus on checking failed test cases now working after Bug fix,
Regressionfocus on checking previously working tests are still working
after changes
14. Explain one defect which you have identified while doing Regression Testing?
15. How much time is required to perform regression in your project?
16. How frequenty your team performs Regression in your project?
17. How much% of Manual Regression your team is performing and
howmuch % of AUtomation Regression your team is performing?
18. Due to slowness in datbase server,dev changed DB server from Sybase to Terada? do we need o perform
only functional regression or performance Regression is also mandatory?
Regression Testing must be performed on code freeze build
Coding for majority of the requirements is completed
Application must be stable to do Regression
Dev is doing code changes can we do regression simutaneously?
Defect Triage meetings
Challenge in Regression Testing:
1. Performing 100% regression testing in shortspan of time
with minimum testing cost
Ans: 1. Automation Regression testing
2. Selective Regression
Note: Regression optimization Technique
Ex: Test critical areas first
Cover high priority test cases in
regression
Cover frequently failed test cases
Smoke Testing
Sanity Testing
BVT Build Verification Test
1. Quality Assurance vs Quality COntrol
2. Verification vs Validation
3. WBT VS BBT
4. Functional Testing vs Non Functional
5. Functional vs Perf Test
6. Load Test vs Stress Test
7. Regression Test Vs Retest
When we go for regression Testing?
Code freeze
Application must be stable
No open defects associated with new functionalities
Comments